Believe it or not, this is a first floor addition and renovation to an existing semi detached house. The owners decided that they needed a little extra space and to update the existing area so a first floor was added along with a new kitchen and living area downstairs. The result was amazing and the complete look was that of a new home. This beautiful home, from the metal front door to the stylish bathrooms took 9 months to complete and left the owners with everything they had hoped for.
Project Gallery
Click the thumbnail images below to view the full size gallery. Use your left & right arrow keys to move forwards and backwards through the gallery.